Above Ground Cables

Bringing Messy Cables Below Ground

LOCATION
Bangkok Wide
EXPERTISE
Infrastructure Study, Project Management, Cost Consultancy
FACILITY
2450 km, communication cable trenches, undergound electrical trays
STATUS
New Build/Ongoing

SEA Consult is working with the Bangkok Metropolitan Authority to clean up the messy cables poles and lines problem and to bring them all underground with 40×80 cm communication cables trays by 2022. This also includes all electrical cables that must be placed at least four meters below ground.

Our Capabilities

Mechanical Engineering

Electrical & Communication Engineering

Sanatory & Plumbing Engineering

Systems Upgrade Design

Infrastructure Planning

Fire Protection Systems

Technical Life Cycle Analysis

System Value Engineering

Selected Key Projects

Bangna Elevated Tollway

Rural Sealed Roads Project

Mass Rapid Transit | Pink Line

o. +66 2 114 7390

 e. bert.b@sea-consult.co.th

Our Experience

Portfolio

Sectors

Expertise

About Us

Our Group

Management

History